Cinder removing facility. FALLER 120149
Cinder removing facility. FALLER 120149
search
  • Cinder removing facility. FALLER 120149
  • Cinder removing facility.

Cinder removing facility. FALLER 120149

Kit includes a gantry crane, 2 heated swivel water spouts (DB NW 200), 2 slag hoppers, 1 ground plate (344 mm) with slag pit, rolling slag carriage, and bucket. Above the slag pit the ground plate is provided with two driving rails. It can be
€57.95
Tax included

120149

Data sheet

Scale
1:87 (H0)
Size
344 x 147 x 102 mm
New

Kit includes a gantry crane, 2 heated swivel water spouts (DB NW 200), 2 slag hoppers, 1 ground plate (344 mm) with slag pit, rolling slag carriage, and bucket. Above the slag pit the ground plate is provided with two driving rails. It can be connected to all types of tracks, even those with middle conductor, excepted Märklin’s C track. Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148). Such an installation allows the gantry crane to span 3 tracks – 2 slag pits and 1 track for slag wagons. This building kit contains: 69 single parts in 2 colours and 1 construction instruction.
IN FAQ

Consultas sobre este producto


Send us your question help

 

Be the first to ask a question about this product!

Question about the product

* Required fields
Send

The question has been correctly sent