2 bridge heads NOCH 67034
2 bridge heads, NOCH 67034
search
  • 2 bridge heads, NOCH 67034

2 bridge heads NOCH 67034

You will need a Pair of Bridge Heads for Bridges with Beam, if you want to combine the Truss Approach Bridge (ref. 67023) with a bridge without beam (e.g. ref. 67024, 67025,, 67026, 67029, 67030, 67050), in order to build in the whole bridge
€12.70
Tax included

67034

Data sheet

Scale
1:87 (H0)
New

You will need a Pair of Bridge Heads for Bridges with Beam, if you want to combine the Truss Approach Bridge (ref. 67023) with a bridge without beam (e.g. ref. 67024, 67025,, 67026, 67029, 67030, 67050), in order to build in the whole bridge construction to the left and to the right in the landscape.

Consultas sobre este producto

Be the first to ask a question about this product!